Home / Remodeling / basements

Design-Build • basements

Lower Levels That Don't Feel Like Basements.

You already own the space. We make it worth having.

Finished lower levels, entertainment floors, golf simulator bays and guest suites across Oakland, Macomb and Wayne Counties — with the height, moisture and mechanical questions solved properly rather than framed around.

Book a consultation
Open plan basement lounge looking toward the wet bar and kitchenette in a Birmingham MI basement remodel

4.9 star

Over 100 reviews

5 year

Warranty on our workmanship

2014

Founded across Oakland, Macomb and Wayne Counties

100%

In-house design, source & build

Open plan basement with a lounge, home gym and navy wet bar in a Royal Oak MI basement finishing project

Why Lower Levels Are Different

Nobody builds a basement. They stop ignoring one.

The shell is already there — walls, floor, and a roof two storeys up. What you are paying for is the conversion: turning the room the furnace lives in into one the family chooses.

Two things decide whether that conversion is possible, and neither of them is a finish. The first is what is hanging from the joists. Ductwork, beams and plumbing runs sit exactly where you want headroom, and moving them is the difference between a room that works and a room with a bulkhead through the middle of it. It is also the most common reason two basements of identical size price tens of thousands apart.

The second is water. It gets resolved before framing or it does not get resolved. Grading, drainage, sump capacity, vapour management — all of it comes first, because finishing over a moisture problem does not fix the problem. It puts drywall in front of it, and drywall is patient.

Settle those two and everything after is design. Miss them and there is no finish selection that saves the room.

What's Included

What We Build Into a Lower Level

01 – Height & Mechanicals

Ducts, beams and plumbing runs sit exactly where you want headroom. Relocating them is the single most effective thing that can be done to a lower level — eight inches of clear height is the difference between a room people choose to be in and one they visit.

Access to shutoffs, cleanouts, the panel and the sump is planned into the design, not discovered behind finished drywall two years later.

02 — Moisture & Structure

Grading, drainage, sump capacity and vapour management resolved before any framing goes up. Finishing over a moisture problem does not solve it — it puts drywall in front of it and buys you two dry-looking years.

Egress windows cut where a bedroom is planned, with the foundation opened properly and the well built to code rather than improvised.

03 — Millwork & Bars

Custom cabinetry, wet bars with stone tops and integrated lighting, media walls, built-in seating and storage designed around the mechanical constraints rather than fighting them.

This is where the range on a lower level genuinely widens, and where the difference between $90,000 and $250,000 mostly lives.

04 — Specialty Rooms

Golf simulator bays, home gyms, wine rooms, theatres and guest suites — each with its own demands on height, structure, power, ventilation and climate control.

All of them are straightforward inside a full build and difficult to retrofit, so they are raised at the first design meeting rather than added in month four.

Basement lounge looking toward the kitchenette with built in wine storage in a Birmingham MI remodel

Basement | Birmingham

The Westchester Lower Level

Type your paragraph here

Finished basement in Royal Oak MI with a lounge, home gym and wet bar under a black painted exposed ceiling

Basement | Royal Oak

The Modern Basement Retreat

Type your paragraph here

DESIGN IS A PAID PHASE, CREDITED TOWARD YOUR BUILD

Real design takes real work, and a firm that gives it away recovers the cost somewhere you cannot see. The full fee comes off your construction contract when you build with us.

How we work

What Decides a Lower Level

01

Height and water come before finishes

A basement with eight-foot joists and a dry slab can become a genuinely great room. One with six and a half feet of clearance and a seasonal moisture problem needs both of those solved before finishes are worth discussing at all. We measure and assess on the first visit, because these two answers set the ceiling on everything else.

02

Adding a bathroom means breaking the slab

Below-grade drainage means opening the concrete and running new lines to the main. That is the work, and it is the single largest step up in scope available down there, so it gets decided at design rather than discovered at demolition.

03

Egress is a code question with a structural answer

Any bedroom below grade requires a code-compliant egress window. That means cutting the foundation wall and building a proper window well, which affects both the budget and the layout. If a guest suite or a fifth bedroom is the goal, this is the line item that decides where it can go.

04

The furnace upstairs was not sized for this

Finishing a lower level adds a thousand square feet or more of conditioned space to a system that was sized for the floors above it. Sometimes the existing equipment carries it. Often it needs a dedicated zone, additional returns, or supplementary heat. We check the capacity during design, because a beautifully finished room that never gets warm is a failure nobody photographs.

05

Lighting decides whether it feels like a basement

Recessed layout, ceiling strategy and where the mechanicals end up matter far more to how the space reads than any finish selection. Low ceilings with a considered lighting plan feel better than high ones without. It is a design decision made at the start, not a fixture chosen at the end.

Wet bar looking toward the home gym area in a Birmingham MI basement remodel

Basement | Birmingham

The Westchester Lower Level

An addition costs $350 to $550 a square foot. A finished lower level with a full bath runs $75 to $125, because the hole, the walls and the roof were paid for the year the house went up.

Straight answer

Some basements should stay basements.

If the clear height is not there, and the mechanicals cannot be moved to find it, no budget and no design will stop the finished room reading as a basement. We would rather tell you that at the first visit, with a tape measure, than after you have paid for drawings.

Water is the same. A slab that is damp after a wet week is a drainage project before it is a renovation, and finishing over it only decides when you find out about it.

Good to know

Common Questions

How much does it cost to finish a basement in Metro Detroit?

An open finish runs $55,000 to $90,000. Adding a full bathroom takes it to $90,000 to $150,000. An entertainment level with a bar and millwork runs $150,000 to $250,000, and a full lower-level build with specialty rooms runs $250,000 to $400,000 and up. Full tier-by-tier ranges and a breakdown by city are on our basement cost guide.

How much ceiling height do I need?

Seven feet of finished clear height is the practical working minimum, and eight is where a lower level stops reading as a basement. Below about six feet ten inches before finishes, the honest conversation is about whether relocating mechanicals can buy back the difference — and sometimes it can, which is the cheapest eight inches you will ever buy.

How much ceiling height does a golf simulator need?

Most setups want roughly nine and a half to ten feet of clear height, twelve feet of width and eighteen to twenty feet of depth for a full swing. Plenty of basements across Oakland, Macomb and Wayne Counties can take one, and relocating a single duct run is often what makes the difference.

Can I add a bathroom in the basement?

Almost always. It means breaking the slab to run drainage to the main, which is the biggest single jump in scope available down there — so we price it at design rather than later. In most Michigan homes it drains by gravity once it's in.

What about moisture and water?

We assess it before any framing — exterior grading, drainage, sump capacity and vapor management. Finishing over an unresolved moisture problem does not fix it. It hides it, usually for about two years, and then costs considerably more to put right.

Does finished basement space count toward my square footage?

Below-grade space is generally recorded separately from above-grade square footage in Michigan listings, even when fully finished. It still adds real usable space and real value — it is simply measured and reported differently, which is worth knowing before you budget against a resale assumption.

Thinking about the lower level?

Book a consultation